Below is a panoramic view of the area behind the front counter out into the sw vestibule.

Below is a photo of the kitchen drive thru wall from end to end.

The cooler crew was here today to work on the evaporator, the electricians continued to pull wire, the tile crew was grouting. Outside Atmos was here installing the gas line to the building.