Current Project is Olive Garden in Amarillo, TX
For a larger view of a photo, click directly on the photo.
Olive Garden
Friday, November 19, 2010
Amarillo's Olive Garden
Today we completed all indoor modifications. We also started the asphalt overlay. We are working on completing asphalt so that the lot can be striped on Monday or Tuesday at the latest. We are also awaiting the delivery of the handrails. We managed to work in sections so that Olive Garden could remain open while all work was completed. Above is a photo of today's progress.
Thursday, November 18, 2010
Interior and Exterior Scheduled Work
Today we continued pouring the remainder of concrete for the west side. We also poured the section where the trip hazard was removed. Inside we've started work to make changes so that restrooms and railings are compliant. We continue to be on schedule despite the WINDY Panhandle winds.
Wednesday, November 17, 2010
Olive Garden: West Side of Building
Today we demolition on the west side is in progress. Another crew is forming and setting up for concrete. In the afternoon we were able to pour concrete. Tomorrow we begin the interior work. So far we are on schedule.
Tuesday, November 16, 2010
Pouring Concrete
We were able to pour concrete for handicap sidewalks, ramps and curbs. Progressing on schedule. We should be able to move start the west side work tomorrow.
Monday, November 15, 2010
Olive Garden: East Side Demo Work
I'm in Amarillo, TX working on an Olive Garden. We'll be doing some ADA upgrades and remodifications. We're starting on the exterior of the building. Today we are doing demolition on the east side of the building. Above is a collage of the work completed today.
Thursday, September 30, 2010
Wednesday, September 29, 2010
Additional Concrete Work Ordered
The old handicap sidewalk has been torn out, reformed, and poured. The new sidewalk looks great. In addition two curbs at the front expo line have been cut at an angle to make working in this area safer. The painters have also sealed the curbs for a cleaner look.
Tuesday, September 28, 2010
Wednesday, September 22, 2010
Tuesday, September 21, 2010
Monday, September 20, 2010
Transformation of Hubcap Room
CELEBRATION: TODAY THE INSPECTOR ISSUED THE CERTIFICATE OF OCCUPANCY! Above are photos of the transformation of the hubcap room dining area.
Wednesday, September 15, 2010
One More Look Before Furniture Arrives
The past couple of days Woody focused on making sure all the building was ready for the arrival of the booths, tables, and chairs. These last couple of days meant the subcontractors would have to work around the furniture if they didn't finish any other interior work. Everyone pulled together to get ready and have the building cleared so that the installers would be able to set up all furniture easily once it arrives. THE PLUMBERS PASSED THEIR FINAL PLUMBING INSPECTION YESTERDAY. Coca-Cola came and set up new machines. The sign installer is still working on installing signs around and at the back of the building. Today we passed our ANSUL inspection. The window cleaners and building cleaners arrived and started all cleaning of the building. The HVAC mechanics also had an inspection and PASSED. It's been a busy couple of days, but we've made excellent progress.
Thursday, September 9, 2010
Ryan Elmer, Project Manager Visits Project
The kitchen equipment is set up and the stainless steel tables and cabinets are installed. In the photo in the bottom right corner another table will be delivered to go where the trash can currently is. The photo in the top left corner is a view of the new look of the location where the pizza oven was before. Ryan's visiting the site not only to help Woody with any questions or details but also they are working on a punch list to try to avoid overlooking any work that is still not complete.
Wednesday, September 8, 2010
Railing Installed at Bar and Hubcap Room
Woody sent these photos of the railings now that they are installed and painted. The wood top cap is temporary and is raw in the top left photo and can be seen painted green in the top right photo. It is clear that the building has remained clean while the crews continue to work. The tile crew has returned to finish some grouting and to tile around areas where the kitchen equipment tables have now been installed.