This picture shows the exterior painting done to one side of the Chili's. The painters did two sides and will wait for dry weather to finish the exterior paint. The bar work has continued as has the painting inside and installation of the bruce flooring. The crews are working incredible hours from about 11pm to 11am each day. When possible they work on the exterior through the day. Concrete to be poured in the morning.