They've begun installing the new hardware, changed the fire exit door, and ripped some 1x4 for preparation for the rope lighting. They are almost 100% complete on the bar and the baby changing tables were installed. Painters are taking care of trim inside the restaurant and continue painting outside. Woody found a local stone mason, Jim Saunier, who is installing the stone on the columns at the to go and main entrances. This is very good work. Electricians and tile men have left and replacement crews should return within a few days. But the most talked about project completion for the day is the removal of the CHILI PEPPER from the front of the building.