The framers returned today to continue hanging sheetrock. The mechanics installed flex lines. The dry storage and kitchen are still in progress of being tiled. The electricians continued the overhead electrical work. Finally, the glass crew returned today. They still didn't install any glass, but they did install window frames. EIFS crew started applying foam today & prepared a sample for approval. Plumbers had to put a hose bib at trash enclosure. The brick masons blocked the trash enclosure. Before the top of enclosure is complete the City Inspector, Lloyd Miller, will return to inspect it.