Tile is continuing at McDonald's. They'd been working on the walls and have now started the floors. They are already grouted the kitchen floor. The fire & sprinkler crew passed their inspection test today with the Fire Marshall. Likewise, the utility crew passed the hydrostatic test conducted by the Fire Marshall. The framers have made great progress in hanging sheetrock. The EIFS crew is applying foam. Mechanics are running hvac flex line. The electricians have continued to run overhead lines. Out in the trash enclosure, the brick masons are still blocking.