
The rain finally stopped. The morning started off very overcast. However, the rain held off long enough that the stone water ledge work was completed. The electricians also worked on installing the new play area lighting. The photo also shows the stainless steel that was added behind the ice machine and at the beverage bar. The safe is now in place and the office is really coming along.