Tonight will be the first night that the red light band is lit on the Burger King since it's installation. The electricians worked on connecting those lights as well as some hoods. Interior crew did some additional FRP work, while carpenters installed dining booths. The ansul system was connected and fire wrapping completed. The painters were mudding and painting inside. Outside the next section of the drive thru lane was poured. This is the section under the drive thru canopy. J Kostel is already setting up POS. The photo additionally show the progress of the office, the soda chase, backflow for floor drains, and some quality control on ceiling grid.