Today the electricians finished their kitchen electrical work. Plumbers were able to install the mop sink faucet. The stainless steel was placed at the 3 and 2 compartment sinks. Table tops were also installed. The HVAC mechanics worked on installing stainless steel corners in the kitchen area. The Burger King crew worked on detail cleaning. Mr J Kostel was also onsite today connecting & installing the POS and security systems. The ansul inspection test is set up for this coming Monday. Much progress was made today. Above is a panoramic view of the kitchen as it is coming together. The view is from the back to the front. Photo below left is the kitchen as seen from the front counter area. The collage below shows the ansul system, mop sink faucet, security camera, and stainless steel work.