Today the tile setters finished their work. The carpenters continued to install Marlite paneling in the lobby. They also brought the kitchen equipment back in the building. The awning frames were installed. Concrete crew returned to strip the concrete. HVAC mechanics run flex lines in the kitchen. The electricians were also in the kitchen pulling wire. The plumbers came to install the grease trap in the new location outside the drive thru area. Two mirrors were delivered for the restrooms, as well as the trash bins.