The concrete for the drive thru lane was poured. The photos of the work also show the loop detector was installed before the pour.
The awning fabrication started today. The color will definitely stand out on the building.
The electricians continued installing lights on the exterior for the awnings. They also installed 2x4 in the kitchen.
The tile setters grouted the kitchen area. The carpenters installing Marlite paneling in the lobby area.