We now have a certified pad, forms installed, steel installed and tied, floor drains, plumbing & electrical are roughed in, termite treatment has been completed, and anchor bolts are installed. Concrete crew worked today to make sure that the required clearance was uniform across the entire pad. Woody attempted to get a Saturday inspection to go ahead with pouring the pad. His calls were not returned. Therefore, the crew was unable to pour the pad. At the end of the day the crew was confident that they would pass inspection on Monday. The forecast is calling for clear skies, so weather shouldn't be an issue on Monday.